Permits and approvals
In short: Exempt development in NSW is minor, low-impact building work, such as many garden sheds, decks, pergolas and low retaining walls, that needs no planning or building approval if it meets every standard in the Codes SEPP. Work that misses even one standard needs a complying development certificate or a development application. Exempt work must still be structurally sound and comply with the National Construction Code.
Key takeaways
- An exempt deck or pergola in NSW can cover up to 25 m², with its floor no more than 1 m above existing ground.
- Council summaries of the Codes SEPP limit an exempt retaining wall to 600 mm high, set back from every lot boundary.
- Work that misses any exempt standard needs a complying development certificate, issued in as little as 20 days, or a development application.
- Exempt work needs no approval, but it must still be structurally sound and comply with the National Construction Code.

Planning a deck, pergola or retaining wall in Sydney? Get a quote or call 1300 241 678, and send us your sketch or plans and a few photos of the site.
What is exempt development in NSW?
Exempt development in NSW is minor, low-impact building work that needs no planning or building approval, as long as it meets every development standard that applies to it. The standards are set out in the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, usually called the Codes SEPP.
The NSW Department of Planning's guide to exempt development says a project must comply 100% with all the relevant standards. If a project doesn't meet all of them, it needs approval. The standards control things like the number of structures on the lot, and their location, floor area and height.
What can you build without approval in NSW?
You can build many garden sheds, decks, pergolas, shade structures and low retaining walls without approval in NSW, if each one meets its exempt standards. The table sums up the main limits; each type has further standards in the Codes SEPP.
| Structure | Main exempt limits | Source |
|---|---|---|
| Garden shed | Must meet every standard in clauses 2.17 and 2.18 of the Codes SEPP; can't be used as living space (Class 10a, non-habitable); non-combustible materials on bushfire-prone land; stormwater connection needs council approval under s68 of the Local Government Act 1993 | NSW Department of Planning garden sheds fact sheet |
| Deck, patio, balcony, pergola or terrace | Up to 25 m²; floor no more than 1 m above existing ground; no more than 3 m high at the highest point; no enclosing wall over 1.4 m; at least 900 mm from the lot boundary (5 m in zones RU1, RU2, RU3, RU4, RU6 and R5); not beyond the building line of any road frontage | NSW Department of Planning |
| Total of decks and similar on the lot | No more than 15% of the house's ground floor area on lots over 300 m², or 25 m² on lots up to 300 m² | NSW Department of Planning |
| Shade structure (canvas, fabric or mesh) | No more than 3 m above existing ground; at least 900 mm from each lot boundary (5 m in the zones above); behind the building line of any road frontage; not in a foreshore area | NSW Department of Planning |
| Retaining wall or earthworks | Cut or fill no more than 600 mm and wall no more than 600 mm high; set back from each lot boundary (1 m in the department's 2015 sheet and Cootamundra-Gundagai's fact sheet; Randwick City Council says 900 mm) and at least 1 m from any registered easement, sewer main or water main; at least 2 m from any other retaining wall on the site; at least 40 m from a natural water body | NSW Department of Planning (2 m separation, 40 m from water); 600 mm and setbacks from the department's 2015 information sheet and Cootamundra-Gundagai Regional Council's fact sheet |
On bushfire-prone land, a deck or pergola within 5 m of a house must use non-combustible materials. Metal parts of a deck or pergola must be low-reflective, factory pre-coloured materials.
What rules apply to every exempt project in NSW?
Every exempt project in NSW must be structurally sound, installed to the manufacturer's instructions and compliant with the National Construction Code (NCC). The department's guide adds that exempt work must not make an existing building breach the Building Code of Australia.
Exempt development also can't be carried out:
- on land listed on the State Heritage Register or under an interim heritage order;
- in a wilderness area, or in critical habitat or a declared area of outstanding biodiversity value;
- on public land or over a public road without approval from the council or Transport for NSW.
Some structures have extra exclusions. Retaining walls and earthworks can't go on or in a heritage item, and in a heritage conservation area they must be in the rear yard. They must not redirect surface water or groundwater, or send sediment onto a neighbour's lot.
Exempt work can still need other approvals, like the council approval for a shed's stormwater connection. Near water, stormwater or sewer mains, power lines or telecommunications assets, the department says to contact the infrastructure authority first, whether the work is inside an easement or not.
When do you need complying development or a DA instead?
You need complying development or a development application (DA) when your project misses any exempt standard. Complying development is a fast-track combined planning and construction approval, issued by a council or an accredited certifier when the project meets the Codes SEPP's complying standards. A DA is lodged with, and assessed by, the council.
| Pathway | Who approves | Typical time | When it applies |
|---|---|---|---|
| Exempt development | No approval needed | None | The work meets every exempt standard |
| Complying development certificate (CDC) | Council or an accredited certifier | As little as 20 days | The work misses an exempt standard but meets every complying standard |
| Development application, then a construction certificate | Council | 70 days on average for a DA | The work meets neither set of standards |
The timeframes come from the department's complying development page. As an example, the department's 2015 information sheet says earthworks and structural supports more than 600 mm above or below existing ground level may be approved by a private certifier as complying development. Randwick City Council notes that after a DA is approved, you also need a construction certificate before building starts.
Exempt development in Sydney: what to check locally
In Sydney, the Codes SEPP applies as it does across NSW, but council guidance and your lot's own listings can change the answer. Check three things before you build.
- Boundary setbacks for retaining walls. Randwick City Council says many retaining walls at least 900 mm from lot boundaries meet the exempt criteria if they are no higher than 600 mm. Other council fact sheets give 1 m. Check the current Codes SEPP clause, or ask your council, before you set out a wall near a boundary.
- Heritage and local exclusions. Some exempt standards change in a heritage conservation area: a deck must sit behind the building line, and a retaining wall must be in the rear yard. In very special circumstances, local exclusions apply too, listed in Schedule 4 of the Codes SEPP. Randwick City Council also notes that, under the Codes SEPP's exempt criteria, a site containing a heritage item can't have any fencing built as exempt development.
- Rules that are changing. The department exhibited proposed changes to complying development from 14 May to 24 June 2026, and plans to finalise them later this year.
For Queensland's rules, see our guide to what you can build without council approval in QLD.
When to call a structural engineer
Call a structural engineer when a project goes past the exempt limits, or when it must be sized to carry real loads safely, because the exempt standards set limits but not member or footing sizes. Typical triggers:
- A retaining wall over 600 mm. It is no longer exempt. Under complying development, the department's 2015 information sheet says a retaining wall in a residential area may need certification by a professional engineer if it is more than 600 mm above or below ground and within 1 m of a boundary, or more than 1 m in any other location.
- Pier footings. Since the October 2024 Codes SEPP updates, pier depth is excluded from the excavation limits in the complying development housing codes where an engineer supports it.
- A deck or pergola on a sloping block, or with a floor close to the 1 m limit.
- Anything attached to the house, where new loads go into the existing frame or footings.
- Your certifier or council asks for engineering with a CDC or DA.
Our structural design and consultation service covers decks, pergolas, shade structures and retaining walls. For walls that hold back soil, see our retaining wall engineering service.
Example from our projects
For a free-standing hardwood deck in Hyams Beach NSW, we designed six 450 mm concrete piers with adjustable steel stumps and a hardwood frame built to BAL-29. The five-sheet drawing set was issued for approval before construction.
Frequently asked questions
Can I use an exempt garden shed as a home office or studio?
No. The NSW fact sheet on garden sheds says the exempt standards don't allow these structures to be used as living space, because they are Class 10a non-habitable buildings. A home office, studio or rumpus room needs planning approval, possibly as complying development.
Do I have to tell my neighbours about exempt development?
There is no formal requirement to notify neighbours for exempt development in NSW. The department's fact sheet still suggests talking to them about your plans, because building work can cause disruption.
Does exempt development override a covenant on my title?
No. The department's guide says the Codes SEPP doesn't override other policies or legislation. Covenants and legal agreements on the land still apply, and you need the land owner's approval to work on their land.
What if my house was built before 1987?
The NSW exempt development page warns that buildings built before 1987 may contain asbestos. Have the work area assessed before you start renovating.
Sources
- NSW Department of Planning, Housing and Infrastructure: Exempt development
- NSW Department of Planning, Housing and Infrastructure: Balconies, decks and patios (updated 23 March 2026)
- NSW Department of Planning, Housing and Infrastructure: Shade structures (updated 23 March 2026)
- NSW Department of Planning, Housing and Infrastructure: Earthworks, retaining walls and structural supports (updated 23 March 2026)
- NSW Department of Planning, Housing and Infrastructure: Complying development (updated 26 June 2026)
- NSW Department of Planning and Environment: Understanding exempt development (fact sheet, 2022)
- NSW Department of Planning and Environment: Cabanas, cubby houses, ferneries, garden sheds, gazebos and greenhouses, rules for exempt development (2022)
- NSW Department of Planning, Housing and Infrastructure: Essential Codes SEPP updates (fact sheet, October 2024)
- NSW Department of Planning and Environment: Information Sheet 2.2, Earthworks and retaining walls (January 2015)
- Randwick City Council: Fences and retaining walls
- Cootamundra-Gundagai Regional Council: Common exempt developments, rainwater tanks and retaining walls (fact sheet)